By default, the timeline only details programs, which are chronologically displayed between the start dates and end dates defined.
Each program is represented by a box containing the corresponding thumbnail and label. Depending on the screen size and the number of elements to display, the label may be replaced by the program ID.

The blue vertical line is a chronological marker to highlight the current date. By default it is found in the middle of the screen. You can scroll right or left within the screen to modify the period displayed.
The
and
buttons allow you to increase or reduce the perimeter. The
button also increases the level of detail for a more limited period, until days are displayed, and the
button allows you to display a larger period.
Click the arrow on the right of each program name to display the corresponding content. A program can contain sub-programs, campaigns, and landing pages. A campaign is deployed in the same way as a program and can contain emails, SMS and landing pages.
Note:
As workflows do not have a particular notion of a date, they do not show up in the timeline.
When the content of a program or a campaign is being displayed, the corresponding box turns blue and the arrow on the right-hand side turns upside down. Re-click the arrow to hide the content.

Click a program or any other element displayed to make the corresponding card appear. Then click on the card to go directly to the content of the element selected and modify it.
